Ship gate

Delivery checklist

Final gate before stitch, client handoff, or “done.” Stills-first · SFW path · stop on any identity No-Go. Checks stay in this browser.

0/23 complete
Pre-flight open
0%

Pre-flight

Blockers

Blockers before hero stills or video spend.

0/5

Production Bible lite locked (logline, format, constraints)

Open tool

Character DNA inject ready · transform_allowed: false if identity is frozen

Open tool

DoP visual language card locked (light · lenses · color · format)

Open tool

Shot list ordered · hero / support / draft priorities set

Open tool

Budget counted (stills first · optional video seconds)

Open tool

Generation gates

Rules that keep identity and look stable shot-to-shot.

0/5

DNA prepended on every still/video packet

Open tool

DoP lines inherited (no freestyle palette drift)

Open tool

Identity CUs on 50–85mm language — not cropped ultra-wides

Open tool

Plate status = locked before any i2v / 6s spend

Open tool

One primary move per short clip (or static still montage)

Open tool

Continuity & QA

Stop on identity No-Go. Chain QA before stitch.

0/5

Extend chain planned (clips · motion handoffs · durations)

Open tool

LAST_FRAME_RECAP + motion_out written before any extend

Open tool

Chain QA Go before stitch (identity No-Go = stop)

Open tool

Wardrobe / prop / light side consistent across the shot list

Open tool

Grade continuous (same look · skin protected)

Open tool

Post

Cut picture first. Score second.

0/4

Edit spine set: wide → MS → CU → button

Open tool

Hard cuts default · smash/dissolve only if intentional

Open tool

Sound brief after picture spine (or silent-first accepted)

Open tool

One hero sound event at a time · no clipping on button hit

Open tool

Export

Package what the session produced.

0/4

Project pack assembled (Bible · DNA · DoP · shots · motion · activation)

Open tool

Aspect locked for delivery (2.39 / 16:9 / 9:16 as planned)

Open tool

Negatives still present on final packets

Open tool

Quota / cost note attached for the session

Open tool

Director one-liner

Paste into Studio Director / notes before final stitch

DELIVERY CHECKLIST — run before stitch or client handoff
Bible ✓ DNA ✓ DoP ✓ shot list ✓ plate lock ✓ QA Go ✓ edit spine ✓ sound or silent ✓ pack export ✓
Stop on any identity No-Go. Stills-first. One move per clip.

Ship order

Recommended sequence once pre-flight is green

  1. 1Run this checklist
  2. 2Fix any red items
  3. 3Export Project pack
  4. 4Build hero still in Prompt lab
  5. 5Optional: plate-locked 6s clip
  6. 6Edit (spine + hard cuts)
  7. 7Sound brief or silent-first
  8. 8Done

Rule of thumb: generate with craft 01–06 · cut with 07 · score with 08 · ship only when this checklist is green. Companion markdown lives in the repo under docs/academy/DELIVERY_CHECKLIST.md.